View more

Gift-along update

12:33pm on the 23rd of October, 2007


I am slowly getting there. I have some Peace Fleece (for the tea set) sitting at the post office, K can’t get it until tomorrow morning. :mad:

This is my current list, to be finished by 12.23.07-
*2 winter sets- all left is E’s hat & mittens, N’s hat & mittens, 2nd hat for D (knit/crochet) *N’s scarf in progress*
*Weasley sweater (knit) *in progress*
*MIL’s gift (knit) *in progress*
*Tea set (crochet) *in progress*
*Ice cream treats (crochet)
*Milk carton (crochet)
*Socks & hat for K (knit)
*Miscellaneous kitchen items- 3 Swiffer wet/dry pads, 8 sponges, 6 dishcloths (crochet/knit)
*Doll longies & perhaps a hat & scarf
*Longies x2 (knit- not a gift)
*Soaker (knit- not a gift)
I am going to get going on the kitchen items this week, the tea set (whenever I get the yarn!!), & possibly the ice cream treats later in the week. I guess we’ll see how far I get! I feel like there is so much to do & very soon November will be here. I need to just breathe & remember there is over two months left..

This is what I’ve finished since I started the Gift-along began on 10.06.07-
Sweets set
Fruit set
Pear
12″ Waldorf Friendship doll
Pirate
Superman longies

Your turn, Gift Along blogroll!
Avasmum
Stitchgirl
PixieKnits
Mama Stone



Leave a Reply